PARRAMATTA CBD PLANNING PROPOSAL – NOVEMBER 2019

Council Meeting 11 November 2019 

Parramatta CBD Planning Proposal – Council Report, Attachments and Minutes
Council Reports

11 November 2019 - Item 12.1 – Rescission Motion 1: Parramatta CBD Planning Proposal – Response to Gateway Determination Conditions

Attachment 1: 28 October 2019 – Item 15.1 - Parramatta CBD Planning Proposal – Response to Gateway Determination Conditions.

Attachment 1 includes:

  • Response table to the Gateway Determination Conditions of the draft Parramatta CBD Planning Proposal
  • Draft Consolidated CBD Planning Proposal – October 2019
  • Technical Studies in support of the draft Parramatta CBD Planning Proposal
Minutes

Council Minutes - 11 November 2019 - Item 12.1

Council Minutes – 28 October 2019 - Item 15.1.pdf

parramatt CBD Planning Proposal - Planning Proposal Document and Appendices

Draft Parramatta CBD Planning Proposal – October 2019
Appendix Number Document Name
1a & 1b Current planning controls - Parramatta LEP 2011 Instrument and maps
2a & 2b Proposed planning controls – Proposed LEP amending instrument and maps
3 Parramatta CBD Planning Strategy 2015   
4a & 4b Gateway Determination for the Parramatta CBD Planning Proposal 2018 and table addressing Gateway conditions (provided within the Planning Proposal) 

5

Urbis Heritage Study (2015) 
6a & 6b Heritage Study of Interface Areas 2019 and Council's response to the HAA Heritage Study
7 West Auto Alley Precinct Plan 
8 Marion Street Precinct Plan 
9a & 9b Urban Design & Feasibility Study and City Plan Heritage Study – Church Street Precinct
10a & 10b Overshadowing Technical Paper and JLL Market and Feasibility Analysis - Parramatta CBD (Blocks A - D)
11a & 11b Opportunity Sites Report and LSJ Parramatta CBD Opportunity Sites
12 Economic Review – Achieving A-Grade Office 
13 Strategic Transport Study 2017  
14a, 14b & 14c Updated Flood Risk Management Plans, Parramatta CBD Flood Evacuation Assessment 2019 (Molino Stewart), and Horizontal Evacuation Pilot Study for Parramatta CBD 2017 (SJB) 
15 Preliminary Site Investigation Study for the Auto Alley area (2019a)
16a, 16b & 16c Sustainability and Infrastructure Study 2016, Review (Memo) Sustainability and Infrastructure Study 2019, and Review of High Performing Buildings Study - June 2019 (Kinesis)
17a, 17b, 17c, 17d, 17e & 17f Community Facilities Needs Study 2016 (Elton), Infrastructure Funding Models Study 2016 (GLN), Discussion Paper on Infrastructure Planning and Funding in the Parramatta CBD 2017, Draft Infrastructure Needs Analysis 2017 (CoP), Independent Peer Review of Council's past work on community infrastructure prepared by Aurecon 2017 (Aurecon), and Memo on the Parramatta CBD Community Infrastructure Funding Study 2019 (GLN).